How hydropower producer Hafslund Eco shortened the maintenance downtime of a Francis turbine by early detection of an overheating bearing – avoiding 1,1M Euro revenue loss.
By Visplore GmbH
Reliability and plannability of renewable sources are key issues in enabling the energy transition.
To read more please download this free white paper.