900mm Long Radial Fit Bolts Pushing the Boundaries
By Pilgrim InternationalToshiba America Energy Systems Corporation (TAES) provides energy industry solutions new equipment, retrofits, maintenance, outage planning and more for current and future power generation needs in the Americas, including thermal, hydro and nuclear power plants.
As part of the recently signed supplier agreement, TAES made a request to Pilgrim International early in 2019 to quote for the LP2 GEN bolting for the Prairie state coal-fired power station.
The bolt design was none standard due to the extreme length (+900mm) and there were several months of interaction and design review to ensure TAES were satisfied with the safety factor designed into the coupling bolts.
Download this free white paper for more information.