
IGS HVTS STOPPED EROSIONCORROSION IN WASTEFUELLED CFB BOILER
By Integrated Global Services
Case study: Corrosion and erosion mechanisms were both major contributors to tube wastage in this biomass CFB Boiler, burning waste/biomass.
To read more please download this free white paper.
