Share

The thermal power plant Dianshi 4 x 150MW is the 32nd project for which Innospin and Swiss partners were entrusted to design the complete air-cooled condenser (ACC). The production and project execution will be performed by the local Chinese partner Shouhang IHW Resource Saving.

The Dianshi project is another successful example of Innospin’s business model to provide technology, design and engineering for power plant systems worldwide, tailored and optimised for local production and for local project execution. Innopsin’s ACC projects in China cumulate to 16,180MW steam power output as follows:

  • 2 x 300MW Wulashan
  • 2 x 50MW Zuoquan
  • 2 x 300MW Zhunge’er
  • 2 x 300MW Xilinhaote
  • 2 x 300MW Wusitai
  • 2 x 330MW Huai’an
  • 2 x 330MW Dongsheng
  • 2 x 135MW Nanzhuang
  • 2 x 660MW Datong 3
  • 2 x 60MW Huayue
  • 2 x 330MW Yungang
  • 2 x 330MW Jinneng
  • 2 x 330MW Zhunneng
  • 2 x 300MW Diaobingshan
  • 1 x 330MW Keyouzhong
  • 2 x 200MW Binchang
  • 2 x 300MW Linfenhexi
  • 2 x 330MW Nindong
  • 1 x 50MW Hengdong
  • 2 x 330MW Liupanshan
  • 2 x 330MW Qingtonxia
  • 2 x 310MW Dananhu
  • 2 x 50MW Wangjialing
  • 1 x 600MW Shahe
  • 2 x 330MW Luhuaredian
  • 2 x 330MW Changji
  • 2 x 300MW Huangling
  • 1 x 50MW Meihua
  • 2 x 300MW Kailuang Guye
  • 2 x 300MW Xinjiang
  • 2 x 150MW Gongyeyuan
  • 4 x 150MW Dianshi