Yuncan is a 134MW hydro power project. It is located on Paucartambo and Huachon river/basin in Pasco, Peru. The project is currently active. It has been developed in single phase. The project construction commenced in 2005 and subsequently entered into commercial operation in 2006.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 134 | 134 | – | Active | Pasco, Peru |
---|
Description
The project is currently owned by Engie Energia Peru.
Yuncan is a run-of-river project. The gross head of the project is 452m. The penstock length is 574m. The project generated 901 GWh of electricity. The project cost is $260m.
Development Status
The project construction commenced in 2005 and subsequently entered into commercial operation in 2006.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataContractors Involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 3 units of pelton turbines, each with 44.5MW nameplate capacity.
Toshiba Energy Systems and Solutions supplied 3 electric generators for the project. The generator capacity is 47 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.