Severo-Zapadnaya Thermal Power Plant is a 900MW gas fired power project. It is located in Saint Petersburg, Russia. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2000.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 900 | 900 | – | Active | Saint Petersburg, Russia |
---|
Description
The project is currently owned by Inter RAO UES with a stake of 100%.
It is a CCGT with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Diesel.
The project generated 4,948,600MWh of electricity.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in December 2000.
Contractors Involved
Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block I) is equipped with Leningradsky Metallichesky Zavod T-150-7,7 steam turbine. The phase consists of 1 steam turbine with 150MW nameplate capacity.
Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block I) is equipped with Siemens SGT5-2000E gas turbines. The phase consists of 2 gas turbines with 150MW nameplate capacity.
Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block II) is equipped with Leningradsky Metallichesky Zavod T-150-7,7 steam turbine. The phase consists of 1 steam turbine with 150MW nameplate capacity.
Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block II) is equipped with Siemens SGT5-2000E gas turbines. The phase consists of 2 gas turbines with 150MW nameplate capacity.
Electrosila supplied TZFG-160-2MU3 electric generator for the Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block I).
Electrosila supplied TFG-160-2U3, TFP-160-2U3 electric generator for the Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block I).
Electrosila supplied TZFP-160-2MUZ electric generator for the Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block II).
Electrosila supplied TZFG-160-2MUZ electric generator for the Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block II).
Podolsk Machine-Building Plant ZIO supplied steam boiler for the Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block I).
Podolsk Machine-Building Plant ZIO supplied steam boiler for the Severo-Zapadnaya Thermal Power Plant (Severo-Zapadnaya Thermal Power Plant Block II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.