Riyadh PP9 Power Plant Block A & B is a 1,200MW gas fired power project. It is located in Al Riyadh, Saudi Arabia. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in February 1997.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 1,200 1,200 Active Al Riyadh, Saudi Arabia

Description

The project is currently owned by Saudi Electricity.

It is a combined cycle gas turbine (ccgt) power plant.

Development Status

The project got commissioned in February 1997.

Contractors Involved

Arabian Bemco Contracting was selected to render EPC services for the gas fired power project.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 16 units of 7E.03 gas turbines, each with 50MW nameplate capacity.

GE Power was selected as the turbine supplier for the Gas fired project. The company provided 4 units of Single Cylinder, Non-Reheat, Condensing Type steam turbines, each with 100MW nameplate capacity.

GE Power supplied 7A6 electric generator for the project.

GE Power supplied 7FH2 electric generator for the project.

John Cockerill Group supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.