Sunkoshi 3 is a 683MW hydro power project. It is planned on Sunkoshi river/basin in Bagmati, Nepal. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2030 and is expected to enter into commercial operation in 2034. Buy the profile here.
Description
The project is currently owned by Nepal Electricity Authority.
Sunkoshi 3 is a pumped storage project. The hydro reservoir capacity is planned to be 1,220 million cubic meter. The gross head of the project will be 116.3m. The penstock diameter will be 8.4m. The project is expected to generate 2,070 GWh of electricity.
The hydro power project consists of 3 units of francis turbines.
Development status
The project construction is expected to commence from 2030. Subsequent to that it will enter into commercial operation by 2034.
For more details on Sunkoshi 3, buy the profile here.