Shogo-Sin is a 132MW hydro power project. It is planned on Lutkho river/basin in Khyber Pakhtunkhwa, Pakistan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2029 and is expected to enter into commercial operation in 2032. Buy the profile here.
Description
The project is being developed and currently owned by Pakhtunkhwa Energy Development Organization.
Shogo-Sin is a run-of-river project. The gross head and net head of the project will be 248.5m and 231m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 3 in number. The penstock length will be 80m. The penstock diameter will be 1.85m. The project is expected to generate 585 GWh of electricity.
The hydro power project consists of 3 units of pelton turbines.
The project will have 3 electric generators installed at the project site. The generator capacity is likely to be 51.8 MVA.
Development status
The project construction is expected to commence from 2029. Subsequent to that it will enter into commercial operation by 2032.
Contractors involved
Frontier Works Organization is expected to render engineering procurement construction services for the hydro power project.
For more details on Shogo-Sin, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.