Shiroro is a 600MW hydro power project. It is located on Kaduna river/basin in Niger, Nigeria. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1990. Buy the profile here.
Description
The project is currently owned by North South Power with a stake of 100%.
The hydro reservoir capacity is 7,000 million cubic meter. The gross head of the project is 97m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 4 in number. The penstock length is 300m. The penstock diameter is 6.3m. Shiroro underwent through rehabilitation & modernization during 1992-2002; 2016. The project generated 2,700 GWh of electricity.
Development status
The project got commissioned in 1990.
Contractors involved
Voestalpine was selected as the turbine supplier for the hydro power project. The project consists of 4 units of Francis turbines, each with 150MW nameplate capacity.
Koncar - Elektroindustrija supplied 2 electric generators for the Shiroro (Shiroro - Active). The generator capacity is 176.5 MVA.
Koncar - Elektroindustrija supplied 2 electric generators for the Shiroro (Shiroro - Rehab). The generator capacity is 176.5 MVA.
For more details on Shiroro, buy the profile here.