Shaanxi Baoji No.2 Power Plant is a 2,920MW coal fired power project. It is located in Shaanxi, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 1998. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Shaanxi Baoji No.2 Power Plant

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by China Energy Investment with a stake of 100%.

It is a Steam Turbine power plant that is used for Baseload.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Expansion) consists of 2 steam turbines with 200MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit II) consists of 1 steam turbine with 660MW nameplate capacity.

Development status

The project got commissioned in December 1998.

Contractors involved

Northwest Electric Power Design Institute was selected to render engineering procurement construction services for the coal fired power project.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit I) is equipped with Dongfang Turbine N300-16.7/537/537-4 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit II) is equipped with Dongfang Turbine N300-16.7/537/537-4 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit III) is equipped with Dongfang Turbine N300-16.7/537/537-5 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit IV) is equipped with Dongfang Turbine N300-16.7/537/537-5 steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.

Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit I) is equipped with Shanghai Steam Turbine NJK660-24.2 / 566/566 steam turbine. The phase consists of 1 steam turbine with 660MW nameplate capacity.

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit I).

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit II).

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit III).

DEC Dongfang Electric Machinery supplied QFSN-300-2-20 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit IV).

Shanghai Electrical Machinery Group supplied QFSN-660-2 electric generator for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit I).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit I).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit II).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit III).

Dongfang Boiler Group supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase I Unit IV).

Shanghai Boiler Works supplied steam boiler for the Shaanxi Baoji No.2 Power Plant (Shaanxi Baoji No.2 Power Plant Phase II Unit I).

For more details on Shaanxi Baoji No.2 Power Plant, buy the profile here.

This content was updated on 14 October 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.