The Rovinari Power Station Expansion is 600MW coal fired power project. It is planned in Gorj, Romania. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the dormant stage. It will be developed in a single phase. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Rovinari Power Station Expansion

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project is being developed and currently owned by China Huadian Engineering and Complexul Energetic Oltenia. The company's ownership stake in the project stands as 91.06% and 8.94% respectively.

It is a Steam Turbine power plant.

For more details on Rovinari Power Station Expansion, buy the profile here.

About China Huadian Engineering

China Huadian Engineering Co Ltd (CHEC), a subsidiary of China Huadian Corporation Fulaerji Power Generation Plant, is a construction and engineering company that offers engineering design and EPC contracting services. The company operates and installs EPC for projects of heavy machinery including bulk material handling system, hydraulic machinery, green mining equipment, lifting machinery, off-shore machinery, piping system, air-cooling system, and steel structures. It also provides environmental protection and water treatment services and contracting services for industries such as harbor, mining, metallurgy, petrifaction, electric power, civil, and energy sectors. CHEC is headquartered in Beijing, China.

About Complexul Energetic Oltenia

Complexul Energetic Oltenia SA (CEO) is a renewable energy company. The company provides lignite-based electricity and heat generation, and extraction and preparation of lignite. It operates in coal production and energy production. CEO generates electricity and heat and sells coal to third parties mainly to the electricity producers. The company offers raw materials that are used to generate power from the lignite extracted from its open pits in Oltenia Mining Basin. The company serves wholesale electricity markets and retail markets including household consumer’s non-household consumers. CEO is headquartered in Targu Jiu, Gorj, Romania.

This content was updated on 14 October 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.