Peixoto is a 476MW hydro power project. It is located on Grande river/basin in Minas Gerais, Brazil. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1957. Buy the profile here.
Description
The project is currently owned by Furnas Centrais Eletricas with a stake of 100%.
Peixoto is a reservoir based project. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 10 in number. The penstock length is 6.15m. The penstock diameter is 7.08m.
Development status
The project got commissioned in 1957.
Contractors involved
The turbines for the hydro power project have been supplied by Dominion Electric Supply, MEP and Morgan Smith.
The electric generators for the project were procured from Brown Boveri, GE Renewable Energy and Westinghouse.
For more details on Peixoto, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.