Maysville is a 600MW hydro power project. It is planned on Ohio river/basin in Kentucky, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2031 and is expected to enter into commercial operation in 2035. Buy the profile here.
Description
The project is being developed by rPlus Hydro. Gridflex Energy and rPlus Energies are currently owning the project.
Maysville is a pumped storage project. The hydro reservoir capacity is planned to be 12.334 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 5 in number. The penstock length will be 853.44m. The penstock diameter will be 5.4m. The project is expected to generate 3,200 GWh of electricity.
The hydro power project consists of 3 units of pump turbines.
Development status
The project construction is expected to commence from 2031. Subsequent to that it will enter into commercial operation by 2035.
For more details on Maysville, buy the profile here.