Kurobegawa 2 is a 72MW hydro power project. It is located on Kurobe river/basin in Toyama, Japan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1933 and subsequently entered into commercial operation in 1936. Buy the profile here.
Description
The project is currently owned by The Kansai Electric Power.
The hydro reservoir capacity is 2.12 million cubic meter. The net head of the project is 177.02m.
The hydro power project consists of 3 turbines.
The project has 3 electric generators installed at the site.
Development status
The project construction commenced in 1933 and subsequently entered into commercial operation in 1936.
For more details on Kurobegawa 2, buy the profile here.