Kings Point Wind Farm is a 149.4MW onshore wind power project. It is located in Missouri, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 2020 and subsequently entered into commercial operation in 2021. Buy the profile here.
Description
The project was developed by Steelhead Americas and Tenaska Energy. The project is currently owned by The Empire District Electric with a stake of 100%.
The Kings Point Wind Farm (Kings Point Wind Farm_Phase I), has 120m high towers.
The Kings Point Wind Farm (Kings Point Wind Farm_Phase II), has 122m high towers.
Development status
The project is currently active. The project construction commenced in 2020 and subsequently entered into commercial operation in 2021.
Contractors involved
Kings Point Wind Farm (Kings Point Wind Farm_Phase I) is equipped with Vestas Wind Systems V110-2.0 MW turbines. The phase consists of 12 turbines with 2MW nameplate capacity.
Kings Point Wind Farm (Kings Point Wind Farm_Phase II) is equipped with Vestas Wind Systems V120-2.2 turbines. The phase consists of 57 turbines with 2.2MW nameplate capacity.
For more details on Kings Point Wind Farm, buy the profile here.
About Tenaska Energy
Tenaska Energy Inc (Tenaska Energy) specializes in designing, developing, owing and operating electricity generation plants. Tenaska Energy is headquartered in Omaha, Nebraska, the US.