Khersan III is a 400MW hydro power project. It is planned on Khersan river/basin in Chahar Mahaal and Bakhtiari, Iran. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the under construction stage. It will be developed in a single phase. The project construction is likely to commence in 2018 and is expected to enter into commercial operation in 2027. Buy the profile here.
Description
The project is being developed and currently owned by Iran Water and Power Resources Development. The company has a stake of 100%.
Khersan III is a reservoir based project. The hydro reservoir capacity is planned to be 1,158.4 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 4 in number. The penstock diameter will be 5.2m. The project is expected to generate 1,121 GWh of electricity.
The hydro power project consists of 4 turbines, each with 100MW nameplate capacity.
The project will have 4 electric generators installed at the project site. The generator capacity is likely to be 118 MVA.
Development status
The project construction is expected to commence from 2018. Subsequent to that it will enter into commercial operation by 2027.
Contractors involved
Sumec and Tana Energy Management are expected to render engineering procurement construction services for the hydro power project.
For more details on Khersan III, buy the profile here.
About Iran Water and Power Resources Development
Iran Water and Power Resources Development Co (IWPC) is an energy company that develops and operates power generating, water transfer and pump storage projects. The company provides activities such as preparing, operating and developing hydropower generating facilities and structures; preparing and implementing national projects in the fields of providing and transferring water and pump-storage facilities and structures. IWPC also offers services such as rendering project management services in the fields of hydropower plants facilities; feasibility studies for hydropower projects and others. IWPC is headquartered in Tehran, Iran.