El Cajon is a 300MW hydro power project. It is located on Humuya river/basin in Cortes, Honduras. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1985. Buy the profile here.
Description
The project is currently owned by Empresa Nacional de Energia Electrica.
El Cajon is a reservoir based project. The hydro reservoir capacity is 5,700 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The penstock diameter is 4.8m.
Development status
The project got commissioned in 1985.
Contractors involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 4 units of francis turbines, each with 75MW nameplate capacity.
For more details on El Cajon, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.