Colorado Bend Combined Cycle Power Plant II is a 1,230.3MW gas fired power project. It is located in Texas, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in June 2017. Buy the profile here.
Description
The project is currently owned by Constellation Energy Generation with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The fuel is procured from Gulf South Pipeline Company LP.
Development status
The project got commissioned in June 2017.
Contractors involved
Zachry was selected to render engineering procurement construction services for the gas fired power project.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 2 units of 2x1 MS 7HA.02 gas turbines, each with 360.9MW nameplate capacity.
GE Power was selected as the turbine supplier for the Gas fired project. The company provided 1 unit of D600 steam turbine with 508.5MW nameplate capacity.
GE Power supplied electric generator for the project.
GE Power supplied steam boiler for the project.
GE Power is the O&M contractor for thermal power project.
For more details on Colorado Bend Combined Cycle Power Plant II, buy the profile here.