Bakun AC is a 74.8MW hydro power project. It is located on Bakun river/basin in Ilocos, Philippines. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1997 and subsequently entered into commercial operation in 2000. Buy the profile here.
Description
The project was developed by Luzon Hydro. Aboitiz Equity Ventures, JERA, PCD Nominee and Others are currently owning the project having ownership stake of 51.87%, 27%, 14.88% and 6.25% respectively.
Bakun AC is a run-of-river project. The gross head of the project is 500m. The penstock length is 2,000m. The penstock diameter is 2.5m. The project generated 216 GWh of electricity.
The hydro power project consists of 4 turbines.
The project has 2 electric generators installed at the site. The generator capacity is 44 MVA.
Development status
The project construction commenced in 1997 and subsequently entered into commercial operation in 2000.
Power purchase agreement
The power generated from the project is sold to National Power under a power purchase agreement for a period of 25 years from 2001. The contracted capacity is 70MW.
For more details on Bakun AC, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.