Pembelik is a 131.6MW hydro power project. It is located on Peri river/basin in Elazig, Turkey. The project is currently active. It has been developed in single phase. The project construction commenced in 2010 and subsequently entered into commercial operation in 2015.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 131.6 | 131.6 | – | Active | Elazig, Turkey | Darenhes Electric Production |
---|
Description
The project was developed by Darenhes Electric Production. The project is co-owned by Bilgin Enerji Yatirim Holding and Limak Enerji, with their respective ownership stake of 50% each.
Pembelik is a reservoir based project. The gross head and net head of the project are 77m and 69.4m respectively. The project generated 405 GWh of electricity. The project cost is $176.344m.
Development Status
The project construction commenced in 2010 and subsequently entered into commercial operation in 2015.
Contractors Involved
Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 65.8MW nameplate capacity.
Andritz Hydro supplied 2 electric generators for the project. The generator capacity is 74.2 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.