Lemoyne – Majestic Line is a 345kV overhead line from Lemoyne, Michigan, US, to Majestic, Michigan, US.

The project, which is currently in the planning stage, is expected to be commissioned in 2023.

Description

Lemoyne – Majestic Line is an overhead line that will be operated by Michigan Electric Transmission. The line will carry alternating current (AC) through double circuit cable.

Approximately $0.5m was financed by the authorities to undertake the construction works of the project.

Lemoyne – Majestic Line project development status

The construction works on the Lemoyne – Majestic Line project will be commenced in 2022 and commissioning is expected in 2023.

About Michigan Electric Transmission

Michigan Electric Transmission Company LLC (METC), a subsidiary of ITC Holdings Corp is an electricity transmission company that provides transmission infrastructure projects to improve efficiency in the flow of electricity. The company owns, operates and maintains circuit transmission line in the western and northern portions of Michigan’s Lower Peninsula. ITC provides high voltage systems that transmit electricity from generating stations in Michigan to local electricity distribution facilities. The company ensures reliability, safety, operation and maintenance. It offers its services to residential and commercial customers. METC is headquartered in Novi, Michigan, the US.

Methodology

All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.