The Kuzestan Steel Power Plant is 500MW gas fired power project. It is planned in Khuzestan, Iran. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2024.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 500 500 Permitting Khuzestan, Iran Khouzestan Steel

Description

The project is being developed and currently owned by Khouzestan Steel.

It is a combined cycle gas turbine (ccgt) power plant.

The project cost is expected to be around $355.2m.

Development Status

The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2024.

About Khouzestan Steel

Khouzestan Steel Co (Khouzestan Steel) is the crude steel producer. Khouzestan Steel is headquartered in Iran.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.