Guadalupe Power Plant is a 1,088.2MW gas fired power project. It is located in Texas, the US. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2000.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,088.2 | 1,088.2 | – | Active | Texas, the US |
---|
Description
The project is currently owned by Calpine with a stake of 100%.
It is a combined cycle gas turbine (ccgt) power plant. The fuel is procured from DCP and Energy Transfer OASIS.
The project generated 3,986,819MWh of electricity.
Development Status

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataThe project got commissioned in October 2000.
Power Purchase Agreement
Electric Reliability Council of Texas and Guadalupe Valley Electric Cooperative are the power offtakers from the project.
Contractors Involved
Fluor was selected to render EPC services for the gas fired power project.
Guadalupe Power Plant (Guadalupe Power Plant Block I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 201.9MW nameplate capacity.
Guadalupe Power Plant (Guadalupe Power Plant Block I) is equipped with GE Power 7F.04 gas turbines. The phase consists of 2 gas turbines with 171.1MW nameplate capacity.
Guadalupe Power Plant (Guadalupe Power Plant Block II Unit I) is equipped with GE Power 7F.04 gas turbine. The phase consists of 1 gas turbine with 171.1MW nameplate capacity.
Guadalupe Power Plant (Guadalupe Power Plant Block II Unit II) is equipped with GE Power 7F.04 gas turbine. The phase consists of 1 gas turbine with 171.1MW nameplate capacity.
Guadalupe Power Plant (Guadalupe Power Plant Block II Unit III) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 201.9MW nameplate capacity.
GE Power supplied electric generator for the project.
John Cockerill Group supplied steam boiler for the Guadalupe Power Plant (Guadalupe Power Plant Block I).
John Cockerill Group supplied steam boiler for the Guadalupe Power Plant (Guadalupe Power Plant Block II Unit I).
John Cockerill Group supplied steam boiler for the Guadalupe Power Plant (Guadalupe Power Plant Block II Unit II).
NAES is the O&M contractor for thermal power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.