DEF Rattler Solar Power Plant is a 74.9MW solar PV power project. It is planned in Florida, the US. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2022.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 74.9 | – | 74.9 | Permitting | Florida, the US | Duke Energy Florida |
---|
Description
The project is being developed and currently owned by Duke Energy Florida. The company has a stake of 100%.
DEF Rattler Solar Power Plant is a ground-mounted solar project.
The project is expected to supply enough clean energy to power 23,000 households. The project cost is expected to be around $80.742m.
The solar power project consists of 270,000 modules.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataDevelopment Status
The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2022.
About Duke Energy Florida
Duke Energy Florida, LLC (Duke Energy Florida), a subsidiary of Duke Energy Corp, is a regulated public utility. It carries out the generation, transmission, distribution and sale of electricity in Florida. The company operates diversified generation facilities utilizing coal, gas and oil. Duke Energy Florida’s power generation portfolio includes, fully owned and jointly owned power generation facilities. It operates low voltage, medium voltage and high voltage lines across Florida. The company serves residential, commercial, industrial and wholesale customers. Duke Energy Florida is headquartered in St. Petersburg, Florida, the US.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.