The AMS-Hybrid-Electric Buildings – Battery Energy Storage Systems is an 11,000kW energy storage project located in California, US.
The electro-chemical battery energy storage project uses lithium-ion as its storage technology. The project was announced in 2015 and was commissioned in 2018.
Description
The AMS-Hybrid-Electric Buildings – Battery Energy Storage Systems was developed by Advanced Microgrid Solutions.
The key applications of the project are demand response and load following.
Contractors involved
Advanced Microgrid Solutions and Tesla have delivered the battery energy storage project.
Additional information
The 21 high-rise office buildings are equipped with energy management and cloud-based optimization software that employs advanced analytics to enable each building to control its demand from the electric grid, and respond in unison when SCE signals a need to reduce load on the grid.
About Advanced Microgrid Solutions
Advanced Microgrid Solutions offers an artificial intelligence (AI) based energy software that optimizes the value of batteries, renewables and entire asset portfolios to use more clean energy with higher ROI.
Methodology
All publicly-announced energy storage projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects are sourced through secondary information sources such as country specific power players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.