The Abernedd Power Plant is 300MW gas fired power project. It is planned in Wales, the UK. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in October 2026.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 300 | – | 300 | Permitting | Wales, the UK | Abernedd Power |
---|
Description
The project is being developed and currently owned by Abernedd Power.
It is a gas turbine power plant that will be used for Peakload.
The project cost is expected to be around $355.65m.
The Gas fired project consists of 1 gas turbine with 300MW nameplate capacity.

US Tariffs are shifting - will you react or anticipate?
Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.
By GlobalDataDevelopment Status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by October 2026.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.