Global transmission capacity was estimated to have reached 21,846,736MVA by the end of 2022 and is forecasted to grow to 28,915,469MVA by 2028. Bulgaria had 33,809MVA of capacity in 2022 and this is expected to rise to 34,374MVA by 2028. Listed below are the five largest transmission projects by capacity in Bulgaria, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Power Transmission Project Profiles

Buy the Profiles

Data Insights

The gold standard of business intelligence.

Find out more

1. Blagoevgrad Substation

Blagoevgrad Substation is a 400kV substation located at Blagoevgrad, Blagoevgrad, Bulgaria. The substation is proposed and is expected to be commissioned in 2027. The Blagoevgrad Substation will be operated by Electroenergien Sistemen Operator EAD.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Blagoevgrad Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.

2. Bobov Dol Substation

Bobov Dol Substation is a 400/220kV substation located at Bobov Dol Thermal Power Plant, Kyustendil, Bulgaria. The substation is proposed and is expected to be commissioned in 2028. The Bobov Dol Substation will be operated by Electroenergien Sistemen Operator EAD.

The designed voltage level of the substation is 400/220kV and the operating voltage level is 400/220kV. The step in voltage of the project is 400kV and the step out voltage is 220kV. Upon completion, the substation will be able to operate at 630MVA.

Bobov Dol Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.

3. Maritza East Substation

Maritza East Substation is a 400kV substation located at Maritza East, Stara Zagora, Bulgaria. The substation is under construction and is expected to be commissioned in 2024. The Maritza East Substation will be operated by Electroenergien Sistemen Operator EAD.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV. Upon completion, the substation will be able to operate at 100MVA.

Maritza East Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.

4. Plovdiv Substation – Upgrade – 400 kV

Plovdiv Substation – Upgrade – 400 kV is a 400kV substation located at Plovdiv, Plovdiv, Bulgaria. The substation is proposed and is expected to be commissioned in 2027. The Plovdiv Substation – Upgrade – 400 kV will be operated by Electroenergien Sistemen Operator EAD.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Plovdiv Substation – Upgrade – 400 kV is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.

5. Vetren Substation

Vetren Substation is a 400kV substation located at Vetren, Pazardzhik, Bulgaria. The substation is proposed and is expected to be commissioned in 2027. The Vetren Substation will be operated by Electroenergien Sistemen Operator EAD.

The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.

Vetren Substation is owned by Electroenergien Sistemen Operator EAD. Buy the profile here.

For more details on the latest transmission substation projects, buy the project profiles here.

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.