Luis Piedra Buena Power Plant is a 620MW gas fired power project. It is located in Buenos Aires, Argentina. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1989. Buy the profile here.
Description
The project is currently owned by Pampa Energia with a stake of 100%.
It is a Steam Turbine power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Fuel Oil. The fuel is procured from Transportadora de Gas del Sur.
The project generated 3,395,253.4MWh of electricity.
Development status
The project got commissioned in 1989.
Contractors involved
Power Machines was selected as the turbine supplier for thermal power project. The project consists of 2 units of Condensation with 3-Stage & 8-Extraction turbines, each with 310MW nameplate capacity.
Electrosila supplied TBB-320-2T electric generator for the Luis Piedra Buena Power Plant (Central Piedra Buena Power Plant Unit I).
Electrosila supplied TBB-320-2T electric generator for the Luis Piedra Buena Power Plant (Central Piedra Buena Power Plant Unit II).
AC Boilers supplied steam boiler for the Luis Piedra Buena Power Plant (Central Piedra Buena Power Plant Unit I).
AC Boilers supplied steam boiler for the Luis Piedra Buena Power Plant (Central Piedra Buena Power Plant Unit II).
For more details on Luis Piedra Buena Power Plant, buy the profile here.