Lipno I is a 139MW hydro power project. It is located on Vltava river/basin in South Bohemia, Czech Republic. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1953 and subsequently entered into commercial operation in 1959. Buy the profile here.
Description
The project is currently owned by CEZ with a stake of 100%.
Lipno I is a reservoir based project. The hydro reservoir capacity is 309 million cubic meter. The net head of the project is 164m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number. The penstock length is 160m. The penstock diameter is 4.5m. Lipno I underwent through rehabilitation & modernization during 2012-2017, 2018.
Development status
The project construction commenced in 1953 and subsequently entered into commercial operation in 1959.
Contractors involved
CKD Blansko Holding was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 69.5MW nameplate capacity.
For more details on Lipno I, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.