Fujairah F1 Power Plant Desalination is a 662.4MW gas fired power project. It is located in Fujairah, United Arab Emirates. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 2004. Buy the profile here.
Description
Abu Dhabi National Energy and Sembcorp Industries are currently owning the project having ownership stake of 60% and 40% respectively.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel oil.
Development status
The project got commissioned in June 2004.
Power purchase agreement
The power generated from the project is sold to Emirates Water and Electricity under a power purchase agreement for a period of 20 years.
Contractors involved
Doosan Enerbility was selected to render engineering procurement construction services for the gas fired power project.
Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block I) is equipped with GE Power 9E gas turbines. The phase consists of 2 gas turbines with 106.1MW nameplate capacity.
Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block I) is equipped with Siemens Back Pressure steam turbine. The phase consists of 1 steam turbine with 119MW nameplate capacity.
Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block II) is equipped with GE Power 9E gas turbines. The phase consists of 2 gas turbines with 106.1MW nameplate capacity.
Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block II) is equipped with Siemens Back Pressure steam turbine. The phase consists of 1 steam turbine with 119MW nameplate capacity.
Siemens supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block I).
Siemens supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block I).
GE Power supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block I).
GE Power supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block I).
Siemens supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block II).
Siemens supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block II).
GE Power supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block II).
GE Power supplied electric generator for the Fujairah F1 Power Plant Desalination (Fujairah F1 Power Plant Block II).
Doosan Enerbility supplied steam boiler for the project.
Doosan Enerbility supplied steam boiler for the project.
Sembcorp Gulf O&M is the O&M contractor for thermal power project.
For more details on Fujairah F1 Power Plant Desalination, buy the profile here.