Corlu Waste to Energy Biomass Power Plant is a 27.6MW biopower project. It is located in Tekirdag, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in October 2015. Buy the profile here.
Description
The project is currently owned by Eren Holding with a stake of 100%.
Corlu Waste to Energy Biomass Power Plant is a combined heat and power (CHP) project. Paper residue which is a kind of industrial waste is used as a feedstock to power the project.
The project consists of 1 turbine with 27MW nameplate capacity.
Development status
The project got commissioned in October 2015.
Contractors involved
Metso was selected to render engineering procurement construction services for the biopower project.
Metso supplied steam boiler for the project. The boiler installed at the site has a capacity of 96TPH. The temperature witnessed inside the boiler is around 530Degree Celsius. The steam is pressurized inside the boiler at 62bar.
For more details on Corlu Waste to Energy Biomass Power Plant, buy the profile here.