Chabahar Power Plant is a 575MW gas fired power project. It is located in Sistan and Baluchistan, Iran. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in June 2008. Buy the profile here.
Description
The project is currently owned by Saba Power & Electricity Industries holding with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is gas. In case of shortage of gas the plant can also run on Gas Oil. The fuel is procured from National Iranian Oil Refining and Distribution Company.
Development status
The project got commissioned in June 2008.
Contractors involved
MAPNA Group was selected to render engineering procurement construction services for the Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-5) project. MAPNA Group was selected to render engineering procurement construction services for the Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-6) project.
Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-1) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 25MW nameplate capacity.
Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-2) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 25MW nameplate capacity.
Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-3) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 25MW nameplate capacity.
Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-4) is equipped with GE Power Frame 5 gas turbine. The phase consists of 1 gas turbine with 25MW nameplate capacity.
Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-5) is equipped with MAPNA Turbine Engineering & Manufacturing MGT-70 gas turbine. The phase consists of 1 gas turbine with 157.5MW nameplate capacity.
Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-6) is equipped with MAPNA Turbine Engineering & Manufacturing MGT-70 gas turbine. The phase consists of 1 gas turbine with 157.5MW nameplate capacity.
MAPNA Generator Engineering & Manufacturing supplied electric generator for the Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-5).
MAPNA Generator Engineering & Manufacturing supplied electric generator for the Chabahar Power Plant (Chabahar Diesel Fired Power Plant GT-6).
For more details on Chabahar Power Plant, buy the profile here.