Aksu is a 51MW hydro power project. It is located on Coruh river/basin in Erzurum, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 2008 and subsequently entered into commercial operation in 2012. Buy the profile here.
Description
The project was developed by Borusan EnBW Enerji Yatirimlari ve Uretim and is currently owned by Calik Enerji Elektrik Uetim ve Madencilik.
Aksu is a run-of-river project.
Aksu (Aksu main) consists of 2 units of pelton turbines.
Aksu (Yedigol) consists of 2 units of pelton turbines.
Development status
The project construction commenced in 2008 and subsequently entered into commercial operation in 2012.
Contractors involved
Indar Electric supplied 2 electric generators for the Aksu (Aksu main). The generator capacity is 11 MVA.
Indar Electric supplied 2 electric generators for the Aksu (Yedigol). The generator capacity is 11 MVA.
For more details on Aksu, buy the profile here.