Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. Tanzania had 6,869Ckm of line length in 2023 and this is expected to rise to 8,694Ckm by 2028. Listed below are the five largest transmission projects by line length in Tanzania, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Chalinze – Dodoma Line
The Chalinze – Dodoma Line is a 400kV overhead line with a length of 345Ckm running from Chalinze to Dodoma. The project is under construction and is expected to be commissioned in 2024.
The Chalinze – Dodoma Line is an overhead line that will be operated by Tanzania Electric Supply. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Dar II – Morogoro Line
The Dar II – Morogoro Line is a 400kV overhead line with a length of 179Ckm running from Dar-2 to Morogoro. The project is proposed and is expected to be commissioned in 2035.
The Dar II – Morogoro Line is an overhead line that will be operated by Tanzania Electric Supply. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Iringa – Mbeya Line
The Iringa – Mbeya Line is a 400kV overheadIringa to Mbeya. The project is under construction and is expected to be commissioned in 2026.
The Iringa – Mbeya Line is an overhead line that will be operated by Tanzania Electric Supply. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Makambako – Mchuchuma Line
The Makambako – Mchuchuma Line is a 400kV overhead line with a length of 200Ckm running from Makambako to Mchuchuma. The project is proposed and is expected to be commissioned in 2035.
The Makambako – Mchuchuma Line is an overhead line that will be operated by Tanzania Electric Supply. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Mbeya – Sumbawanga Line – New – 400 kV
The Mbeya – Sumbawanga Line – New – 400 kV is a 400kV overhead line with a length of 340Ckm running from Mbeya to Sumbawanga. The project is under construction and is expected to be commissioned in 2024.
The Mbeya – Sumbawanga Line – New – 400 kV is an overhead line that will be operated by Tanzania Electric Supply. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.