Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. South Korea had 35,400Ckm of line length in 2023 and this is expected to rise to 36,872Ckm by 2028. Listed below are the five largest transmission projects by line length in South Korea, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Dangjin – North Dangjin Line
The Dangjin – North Dangjin Line is a 765kV overhead line with a length of 30Ckm running from Dangjin to Dangjin. The project is under construction and is expected to be commissioned in 2024.
The Dangjin – North Dangjin Line is an overhead line that will be operated by Korea Electric Power. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
2. Gangwon – Anseong Line
The Gangwon – Anseong Line is a 765kV overheadGangwon to Anseong. The project is under construction and is expected to be commissioned in 2024.
The Gangwon – Anseong Line is an overhead line that will be operated by Korea Electric Power. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Gangwon – Shingyeonggi Line
The Gangwon – Shingyeonggi Line is a 765kV overheadGangwon to Gyeonggi. The project is under construction and is expected to be commissioned in 2024.
The Gangwon – Shingyeonggi Line is an overhead line that will be operated by Korea Electric Power. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
4. Kangwon – Northgyeonggi Line
The Kangwon – Northgyeonggi Line is a 765kV overhead line with a length of 130Ckm running from Kangwon to Northgyeonggi. The project is under construction and is expected to be commissioned in 2024.
The Kangwon – Northgyeonggi Line is an overhead line that will be operated by Korea Electric Power. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Shin hanwool – Gangwon Line
The Shin hanwool – Gangwon Line is a 765kV overheadShin hanwool to Gangwon. The project is planned and is expected to be commissioned in 2025.
The Shin hanwool – Gangwon Line is an overhead line that will be operated by Korea Electric Power. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.