Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. Saudi Arabia had 95,564Ckm of line length in 2023 and this is expected to rise to 106,356Ckm by 2028. Listed below are the five largest transmission projects by line length in Saudi Arabia, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.
1. Aqaba – Tabuk HVDC Line
The Aqaba – Tabuk HVDC Line is a 500kV overhead line with a length of 227.79Ckm running from Aqaba Gulf Transition Station to Tabuk Converter Station, Tabuk. The project is planned and is expected to be commissioned in 2024.
The Aqaba – Tabuk HVDC Line is an overhead line that will be operated by Saudi Electricity. The line will carry direct current (DC) through single circuit cable. Buy the profile here.
2. Abu Hadriyah – Manifa Line
The Abu Hadriyah – Manifa Line is a 380kV overheadAbu Hadriyah to Manifa. The project is under construction and is expected to be commissioned in 2024.
The Abu Hadriyah – Manifa Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
3. Al Jillah – Dawadmi Line
The Al Jillah – Dawadmi Line is a 380kV overheadAl Jillah to Dawadmi. The project is under construction and is expected to be commissioned in 2024.
The Al Jillah – Dawadmi Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through single circuit cable. Buy the profile here.
4. Buhairah – Tabouk Line
The Buhairah – Tabouk Line is a 380kV overhead line with a length of 20Ckm running from Al Buhairah Substation, Tabouk to Tapping point of Tabouk – Tabarja Line. The project is planned and is expected to be commissioned in 2025.
The Buhairah – Tabouk Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
5. Tabuk – Tabarjal Line
The Tabuk – Tabarjal Line is a 380kV overheadTabuk to Tabarjal. The project is under construction and is expected to be commissioned in 2024.
The Tabuk – Tabarjal Line is an overhead line that will be operated by Saudi Electricity. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.
For more details on the latest transmission line projects, buy the project profiles here.