Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. Norway had 37,690Ckm of line length in 2023 and this is expected to rise to 41,567Ckm by 2028. Listed below are the five largest transmission projects by line length in Norway, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Power Transmission Project Profiles

Buy the Profiles

Data Insights

The gold standard of business intelligence.

Find out more

1. Aurland – Sogndal Line

The Aurland – Sogndal Line is a 420kV overhead line with a length of 70Ckm running from Aurland to Sogndal. The project is planned and is expected to be commissioned in 2024.

The Aurland – Sogndal Line is an overhead line. through 142627 circuit cable. Buy the profile here.

2. Evanger – Samnanger Line

The Evanger – Samnanger Line is a 420kV overhead line with a length of 130Ckm running from Evanger to Samnanger. The project is planned and is expected to be commissioned in 2024.

The Evanger – Samnanger Line is an overhead line. through 142627 circuit cable. Buy the profile here.

3. Hamang – Baerum – Smestad Line

The Hamang – Baerum – Smestad Line is a 420kV overhead line with a length of 12Ckm running from Hamang to Smestad. The project is under construction and is expected to be commissioned in 2024.

The Hamang – Baerum – Smestad Line is an overhead line. through 142627 circuit cable. Buy the profile here.

4. Lyse – Stoleheia Line

The Lyse – Stoleheia Line is a 420kV overhead line with a length of 76Ckm running from Lyse to Stoleheia. The project is under construction and is expected to be commissioned in 2024.

The Lyse – Stoleheia Line is an overhead line. through 142627 circuit cable. Buy the profile here.

5. Storheia – Snillfjord Line

The Storheia – Snillfjord Line is a 420kV overheadStorheia to Snillfjord. The project is under construction and is expected to be commissioned in 2024.

The Storheia – Snillfjord Line is an overhead line. through 142627 circuit cable. Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.