Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. Mozambique had 8,088Ckm of line length in 2023 and this is expected to rise to 8,959Ckm by 2028. Listed below are the five largest transmission projects by line length in Mozambique, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Power Transmission Project Profiles

Buy the Profiles

Data Insights

The gold standard of business intelligence.

Find out more

1. Cataxa – Maputo Line

The Cataxa – Maputo Line is a 500kV overheadCataxa to Maputo. The project is under construction and is expected to be commissioned in 2024.

The Cataxa – Maputo Line is an overhead line that will be operated by Electricidade de Mocambique EP. The line will carry direct current (DC) through double circuit cable. Buy the profile here.

2. Chimuara – Namialo Line

The Chimuara – Namialo Line is a 400kV overhead line with a length of 780Ckm running from Chimuara to Namialo. The project is under construction and is expected to be commissioned in 2024.

The Chimuara – Namialo Line is an overhead line that will be operated by Electricidade de Mocambique EP. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

3. Marracuene – Maputo Line

The Marracuene – Maputo Line is a 400kV overheadMarracuene to Maputo. The project is under construction and is expected to be commissioned in 2024.

The Marracuene – Maputo Line is an overhead line that will be operated by Electricidade de Mocambique EP. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

4. Palma – Metoro Line

The Palma – Metoro Line is a 400kV overheadPalma to Metoro. The project is planned and is expected to be commissioned in 2025.

The Palma – Metoro Line is an overhead line that will be operated by Electricidade de Mocambique EP. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

5. Temane – Maputo Line

The Temane – Maputo Line is a 400kV overhead line with a length of 563Ckm running from Temane Thermal Power Station, Temane to Maputo. The project is planned and is expected to be commissioned in 2026.

The Temane – Maputo Line is an overhead line that will be operated by Electricidade de Mocambique EP. The line will carry alternating current (AC) Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.