Global transmission line length was estimated to have reached 5,767,158Ckm by the end of 2023 and is forecasted to grow to 6,669,519Ckm by 2028. Kazakhstan had 27,768Ckm of line length in 2023 and this is expected to rise to 28,861Ckm by 2028. Listed below are the five largest transmission projects by line length in Kazakhstan, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission line segment. Buy the latest transmission line project profiles here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Power Transmission Project Profiles

Buy the Profiles

Data Insights

The gold standard of business intelligence.

Find out more

1. Atyrau – Ulke Line

The Atyrau – Ulke Line is a 500kV overheadAtyrau to Ulke. The project is under construction and is expected to be commissioned in 2025.

The Atyrau – Ulke Line is an overhead line that will be operated by Kazakhstan Electricity Grid Operating. The line will carry alternating current (AC) through single circuit cable. Buy the profile here.

2. Eurasian Energy Corporation – Promyshlennaya Line

The Eurasian Energy Corporation – Promyshlennaya Line is a 500kV overhead line with a length of 57.26Ckm running from Eurasian Energy Corporation to Promyshlennaya. The project is under construction and is expected to be commissioned in 2024.

The Eurasian Energy Corporation – Promyshlennaya Line is an overhead line that will be operated by Kazakhstan Electricity Grid Operating. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

3. Nura – Zhezkazgan Line

The Nura – Zhezkazgan Line is a 500kV overhead line with a length of 550Ckm running from Nura to Zhezkazgan. The project is under construction and is expected to be commissioned in 2025.

The Nura – Zhezkazgan Line is an overhead line that will be operated by Kazakhstan Electricity Grid Operating. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

4. Eurasian Energy Corporation – Pavlodarskaya Line

The Eurasian Energy Corporation – Pavlodarskaya Line is a 220kV overhead line with a length of 20.9Ckm running from Eurasian Energy Corporation to Pavlodarskaya. The project is under construction and is expected to be commissioned in 2024.

The Eurasian Energy Corporation – Pavlodarskaya Line is an overhead line. through 72919 circuit cable. Buy the profile here.

5. Uralsk – Atyrau Line

The Uralsk – Atyrau Line is a 220kV overheadUralsk to Atyrau City. The project is planned and is expected to be commissioned in 2025.

The Uralsk – Atyrau Line is an overhead line that will be operated by Kazakhstan Electricity Grid Operating. The line will carry alternating current (AC) through double circuit cable. Buy the profile here.

For more details on the latest transmission line projects, buy the project profiles here.

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying data, research, and analysis used to produce this article.

GlobalData’s Power Intelligence Center provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide, while its capacity and generation database provides historic and forecast power generation and generation capacity by technology as well as consumption, imports and exports for over 170 countries.