Global transmission capacity was estimated to have reached 21,846,736MVA by the end of 2022 and is forecasted to grow to 28,915,469MVA by 2028. Poland had 65,549MVA of capacity in 2022 and this is expected to rise to 75,825MVA by 2028. Listed below are the five largest transmission projects by capacity in Poland, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Rzeszow Substation
Rzeszow Substation is a 750/400/110kV substation located at Rzeszow, Subcarpathian, Poland. The substation is planned and is expected to be commissioned in 2025. The Rzeszow Substation will be operated by Polskie Sieci Elektroenergetyczne SA.
The designed voltage level of the substation is 750/400/110kV and the operating voltage level is 750/400/110kV. The step in voltage of the project is 750kV and the step out voltage is 110kV.
Rzeszow Substation is owned by Polskie Sieci Elektroenergetyczne SA. Buy the profile here.
2. Czarna Substation
Czarna Substation is a 400/110kV substation located at Czarna, Lodz, Poland. The substation is planned and is expected to be commissioned in 2024. The Czarna Substation will be operated by Polskie Sieci Elektroenergetyczne SA.
The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV.
Czarna Substation is owned by Polskie Sieci Elektroenergetyczne SA. Buy the profile here.
3. Dunowo Substation
Dunowo Substation is a 400/220/110kV substation located at Dunowo, Koszalin, Poland. The substation is proposed and is expected to be commissioned in 2026. The Dunowo Substation will be operated by Polskie Sieci Elektroenergetyczne SA.
The designed voltage level of the substation is 400/220/110kV and the operating voltage level is 400/220/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV.
Dunowo Substation is owned by Polskie Sieci Elektroenergetyczne SA. Buy the profile here.
4. Kozienice Substation – Upgrade – 400/220/110 kV – Phase I
Kozienice Substation – Upgrade – 400/220/110 kV – Phase I is a 400/220/110kV substation located at Kozienice, Central Poland, Poland. The substation is planned and is expected to be commissioned in 2025. The Kozienice Substation – Upgrade – 400/220/110 kV – Phase I will be operated by Polskie Sieci Elektroenergetyczne SA.
The designed voltage level of the substation is 400/220/110kV and the operating voltage level is 400/220/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV.
Kozienice Substation – Upgrade – 400/220/110 kV – Phase I is owned by Polskie Sieci Elektroenergetyczne SA. Buy the profile here.
5. Lublin Systemowa Substation
Lublin Systemowa Substation is a 400/110kV substation located at Lublin, Lublin, Poland. The substation is proposed and is expected to be commissioned in 2028. The Lublin Systemowa Substation will be operated by Polskie Sieci Elektroenergetyczne SA.
The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV. The step in voltage of the project is 400kV and the step out voltage is 110kV.
Lublin Systemowa Substation is owned by Polskie Sieci Elektroenergetyczne SA. Buy the profile here.
For more details on the latest transmission substation projects, buy the project profiles here.