Global transmission capacity was estimated to have reached 21,846,736MVA by the end of 2022 and is forecasted to grow to 28,915,469MVA by 2028. Mexico had 194,557MVA of capacity in 2022 and this is expected to rise to 208,208MVA by 2028. Listed below are the five largest transmission projects by capacity in Mexico, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Tecpatan HVDC Substation
Tecpatan HVDC Substation is a 500/400kV substation located at Tecpatan, Chiapas, Mexico. The substation is planned and is expected to be commissioned in 2025. The Tecpatan HVDC Substation will be operated by Comision Federal de Electricidad.
The designed voltage level of the substation is 500/400kV and the operating voltage level is 500/400kV. The step in voltage of the project is 500kV and the step out voltage is 400kV. Upon completion, the substation will be able to operate at 1950MVA.
Tecpatan HVDC Substation is owned by Comision Federal de Electricidad. Buy the profile here.
2. Kantenah Substation – New – 400/115 kV
Kantenah Substation – New – 400/115 kV is a 400/115kV substation located at Kantenah, Quintana Roo, Mexico. The substation is planned and is expected to be commissioned in 2025. The Kantenah Substation – New – 400/115 kV will be operated by Comision Federal de Electricidad.
The designed voltage level of the substation is 400/115kV and the operating voltage level is 400/115kV. The step in voltage of the project is 400kV and the step out voltage is 115kV. Upon completion, the substation will be able to operate at 500MVA.
Kantenah Substation – New – 400/115 kV is owned by Comision Federal de Electricidad. Buy the profile here.
3. Tamazunchale Substation
Tamazunchale Substation is a 400kV substation located at Tamazunchale, San Luis Potosi, Mexico. The substation is planned and is expected to be commissioned in 2024. The Tamazunchale Substation will be operated by Comision Federal de Electricidad.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV. Upon completion, the substation will be able to operate at 7.5MVA.
Tamazunchale Substation is owned by Comision Federal de Electricidad. Buy the profile here.
4. Tecali Substation
Tecali Substation is a 400kV substation located at Tecali, Puebla, Mexico. The substation is planned and is expected to be commissioned in 2024. The Tecali Substation will be operated by Comision Federal de Electricidad.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV. Upon completion, the substation will be able to operate at 225MVA.
Tecali Substation is owned by Comision Federal de Electricidad. Buy the profile here.
5. Ticul Substation
Ticul Substation is a 400kV substation located at Ticul, Yucatan, Mexico. The substation is planned and is expected to be commissioned in 2024. The Ticul Substation will be operated by Comision Federal de Electricidad.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV. Upon completion, the substation will be able to operate at 133MVA.
Ticul Substation is owned by Comision Federal de Electricidad. Buy the profile here.
For more details on the latest transmission substation projects, buy the project profiles here.