Global transmission capacity was estimated to have reached 21,846,736MVA by the end of 2022 and is forecasted to grow to 28,915,469MVA by 2028. France had 238,670MVA of capacity in 2022 and this is expected to rise to 252,510MVA by 2028. Listed below are the five largest transmission projects by capacity in France, according to GlobalData’s power database. GlobalData uses proprietary data and analytics to provide a complete picture of the global transmission segment. Buy the latest transmission substation project profiles here.
1. Allemond Substation
Allemond Substation is a 400/63kV substation located at Allemond, Auvergne-Rhone-Alpes, France. The substation is under construction and is expected to be commissioned in 2024. The Allemond Substation will be operated by Reseau de Transport d’Electricite.
The designed voltage level of the substation is 400/63kV and the operating voltage level is 400/63kV. The step in voltage of the project is 400kV and the step out voltage is 63kV. Upon completion, the substation will be able to operate at 100MVA.
Allemond Substation is owned by Reseau de Transport d’Electricite. Buy the profile here.
2. Avold Substation
Avold Substation is a 400/225kV substation located at Avold, Grand Est, France. The substation is under construction and is expected to be commissioned in 2024. The Avold Substation will be operated by Reseau de Transport d’Electricite.
The designed voltage level of the substation is 400/225kV and the operating voltage level is 400/225kV. The step in voltage of the project is 400kV and the step out voltage is 225kV. Upon completion, the substation will be able to operate at 600MVA.
Avold Substation is owned by Reseau de Transport d’Electricite. Buy the profile here.
3. Galoreaux Substation
Galoreaux Substation is a 400kV substation located at Galoreaux, Chamonix, France. The substation is planned and is expected to be commissioned in 2025. The Galoreaux Substation will be operated by Reseau de Transport d’Electricite.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV.
Galoreaux Substation is owned by Reseau de Transport d’Electricite. Buy the profile here.
4. Gaudiere Substation – New – 400 kV
Gaudiere Substation – New – 400 kV is a 400kV substation located at Gaudiere, Casson, France. The substation is under construction and is expected to be commissioned in 2024. The Gaudiere Substation – New – 400 kV will be operated by Enedis SA.
The designed voltage level of the substation is 400kV and the operating voltage level is 400kV. The step in voltage of the project is 400kV. Upon completion, the substation will be able to operate at 600MVA.
Gaudiere Substation – New – 400 kV is owned by Enedis SA. Buy the profile here.
5. Romanche Substation
Romanche Substation is a 400/63kV substation located at Romanche, Auvergne-Rhone-Alpes, France. The substation is proposed and is expected to be commissioned in 2026. The Romanche Substation will be operated by Reseau de Transport d’Electricite.
The designed voltage level of the substation is 400/63kV and the operating voltage level is 400/63kV. The step in voltage of the project is 400kV and the step out voltage is 63kV.
Romanche Substation is owned by Reseau de Transport d’Electricite. Buy the profile here.
For more details on the latest transmission substation projects, buy the project profiles here.