Fujian Zhangpu Liu’ao is a 101.6MW onshore wind power project. It is located in Fujian, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 2005. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Fujian Zhangpu Liu’ao

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project is developed and owned by Datang Zhangzhou Wind Power.

Development status

The project is currently active. The project got commissioned in November 2005.

Contractors involved

Fujian Zhangpu Liu’ao (Fujian Zhangpu Liu’ao I) is equipped with Siemens Gamesa Renewable Energy G52-850 kW turbines. The phase consists of 36 turbines with 0.85MW nameplate capacity.

Fujian Zhangpu Liu’ao (Fujian Zhangpu Liu’ao II) is equipped with Suzlon Energy S64-1.25 MW turbines. The phase consists of 36 turbines with 1.25MW nameplate capacity.

Fujian Zhangpu Liu’ao (Fujian Zhangpu Liu’ao III) is equipped with XEMC Windpower XE82-2MW turbines. The phase consists of 2 turbines with 2MW nameplate capacity.

Fujian Zhangpu Liu’ao (Fujian Zhangpu Liu’ao IV) is equipped with XEMC Windpower XE82-2MW turbines. The phase consists of 11 turbines with 2MW nameplate capacity.

For more details on Fujian Zhangpu Liu’ao, buy the profile here.

About Datang Zhangzhou Wind Power

Datang Zhangzhou Wind Power Co., Ltd. (Datang Zhangzhou) is principally engaged in the generation of wind power. It is the investor, constructor, operator, and owner of the Fujian Zhangpu Liuao 30.6 MW wind power project, located in Liuao town, Zhangpu County in Fujian Province. It has installed 36 turbines, each of which has a rated output of 850 kW, providing a total capacity of 30.6 MW. The project activity is expected to generate a total estimated amount of emission reductions 1,086,897 tons CO2. The company plans to install 903.0 MW turbines procured from Denmark Vestas in the two phases. In the first phase, the wind farm shall install 30-50 MW capacity. The installation is laid out by two rows with seven turbines each covering an area of about 3 sq. km. The first phase is planned for two years starting in 2009 and in operation in 2010. In second phase the installed capacity is estimated to reach to 300-400 MW. The company has started wind measuring at Liuao peninsula and the estimated investment of 8 billion RMB Yuan.

This content was updated on 14 October 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.