Santo Antonio do Jari is a 373.3MW hydro power project. It is located on Jari river/basin in Para, Brazil. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2011 and subsequently entered into commercial operation in 2014. Buy the profile here.
Description
The project is co-owned by China Three Gorges Brasil Energia and EDP - Energias do Brasil, with their respective ownership stake of 50% each.
Santo Antonio do Jari is a run-of-river project. The hydro reservoir capacity is 133.39 million cubic meter.
Development status
The project construction commenced in 2011 and subsequently entered into commercial operation in 2014.
Contractors involved
AREVA Koblitz, CESBE and GE Renewable Energy were selected to render engineering procurement construction services for the hydro power project.
The turbines for the hydro power project have been supplied by GE Renewable Energy and Voith Hydro Holding.
The electric generators for the project were procured from GE Renewable Energy and Voith Hydro Holding.
For more details on Santo Antonio do Jari, buy the profile here.