Liancheng Power Plant is an 800MW coal fired power project. It is located in Gansu, China. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in December 2004. Buy the profile here.
Description
The project is currently owned by Datang International Power Generation.
It is a Steam Turbine power plant that is used for Baseload.
Development status
The project got commissioned in December 2004.
Contractors involved
Liancheng Power Plant (Liancheng Power Plant Phase II Unit I) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Liancheng Power Plant (Liancheng Power Plant Phase II Unit II) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 300MW nameplate capacity.
Harbin Electric Machinery supplied QFSN-300-2 electric generator for the Liancheng Power Plant (Liancheng Power Plant Phase II Unit I).
Harbin Electric Machinery supplied QFSN-300-2 electric generator for the Liancheng Power Plant (Liancheng Power Plant Phase II Unit II).
Harbin Boiler supplied steam boiler for the Liancheng Power Plant (Liancheng Power Plant Phase I Unit I).
Harbin Boiler supplied steam boiler for the Liancheng Power Plant (Liancheng Power Plant Phase I Unit II).
Dongfang Boiler Group supplied steam boiler for the Liancheng Power Plant (Liancheng Power Plant Phase II Unit I).
Dongfang Boiler Group supplied steam boiler for the Liancheng Power Plant (Liancheng Power Plant Phase II Unit II).
For more details on Liancheng Power Plant, buy the profile here.