Blue Diamond Advanced Pumped Storage Project is a 450MW hydro power project. It is planned in Nevada, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2027 and is expected to enter into commercial operation in 2030. Buy the profile here.
Description
The project is being developed and currently owned by Control Technology.
Blue Diamond Advanced Pumped Storage Project is a pumped storage project. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock length will be 1,310.64m. The penstock diameter will be 6.4m. The project is expected to generate 1,170 GWh of electricity.
The hydro power project consists of 2 units of francis turbines.
Development status
The project construction is expected to commence from 2027. Subsequent to that it will enter into commercial operation by 2030.
For more details on Blue Diamond Advanced Pumped Storage Project, buy the profile here.
About Control Technology
Control Technology Inc (Control Technology) is a provider of electrical engineering and industrial control services. Control Technology is headquartered in Vista, California, the US.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.