El Paso is a 60MW hydro power project. It is located on Las Damas river/basin in Libertador General Bernardo O’Higgins, Chile. The project is currently active. It has been developed in single phase. The project construction commenced in 2011 and subsequently entered into commercial operation in 2016.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 60 | 60 | – | Active | Libertador General Bernardo O’Higgins, Chile | HydroChile |
---|
Description
The project is developed and owned by HydroChile.
El Paso is a run-of-river project. The gross head and net head of the project are 474.5m and 456m respectively. The penstock length is 5,100m. The penstock diameter is 1.8m. The project generated 252.6 GWh of electricity. The project cost is $135m.
The project has 3 electric generators installed at the site.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project construction commenced in 2011 and subsequently entered into commercial operation in 2016.
Contractors Involved
China National Electric Engineering was selected to render EPC services for the hydro power project.
Zhejiang Jinlun Electromechanic was selected as the turbine supplier for the hydro power project. The company provided 3 units of pelton turbines, each with 20MW nameplate capacity.
About HydroChile
HydroChile S.A. has been established to develop and operate (10-50 MW) “run of river” hydro electric power generation projects in Chile, typically in the capacity range of 10 to 50 MW. It engaged to develop a number of hydro power assets in the medium term
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.