Bajo Anchicaya is a 74MW hydro power project. It is located on Anchicaya river/basin in Valle del Cauca, Colombia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 1955. Buy the profile here.
Description
The project is currently owned by Celsia with a stake of 100%.
Bajo Anchicaya is a reservoir based project. The hydro reservoir capacity is 5 million cubic meter. The gross head of the project is 72m. The project generated 330 GWh of electricity.
Development status
The project got commissioned in 1955.
Contractors involved
The turbines for the hydro power project have been supplied by GE Renewable Energy and Voith Hydro Holding.
The electric generators for the project were procured from ABB and Westinghouse Electric.
For more details on Bajo Anchicaya, buy the profile here.