Beaver Combined Cycle Power Plant is a 586.2MW gas fired power project. It is located in Oregon, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in August 1974. Buy the profile here.
Description
The project is currently owned by Portland General Electric with a stake of 100%.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Distillate Fuel Oil. The fuel is procured from Kelso-Beaver Pipeline, Pacific Gas and Electric Company, Northwest Natural Gas operator.
The project generated 187,751MWh of electricity.
Development status
The project got commissioned in August 1974.
Contractors involved
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit I) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit II) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit III) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit IV) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit V) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit VI) is equipped with GE Power MS7001B gas turbine. The phase consists of 1 gas turbine with 68.3MW nameplate capacity.
Beaver Combined Cycle Power Plant (Beaver Combined Cycle Power Plant Unit VII) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 176.4MW nameplate capacity.
GE Power supplied electric generator for the project.
GE Power supplied electric generator for the project.
The steam boilers for the gas fired power project have been supplied byCleaver-Brooks and GE Power.
For more details on Beaver Combined Cycle Power Plant, buy the profile here.